House product
I have found results from300000+products and80000+suppliers aboutHouse product
Low MOQ Expandable 20FT 40FT Container House with Kitchen and Bathroom
Outdoor Hotel Resort Mobile Prefab Home Space Capsule Tiny Houses
China Factory Price 40FT Easy Install Foldable Ready Made Big Size Folding Modular Prefab Prefabricated Container House
Tiny Luxury Home Toilet Office Portable Mobile Modular Prefab Container House
Portable Tiny Home 2 Bedroom Prefab House Modular Prefabricated Expandable Container House
Double Story Expandable Container House for School Hospital Use
Ranzoo House Product with 2025 New Design and Customizable Layout
China Ready Made Low Cost Flat Pack Container Porta Cabin Living and Office Prefabricated House Product
Premium Container House Modular Homes Homes Prefabricated Houses with Modermdesign for Global Housing Solutions
2026 Popular Mobile Residential Smart Home Modern Space Cabin Mobile House
Foldable Modern Tiny House Modular Container Double Wing Bedroom Expandable House with Kitchen Bathroom
Luxury 20FT Tiny Prefabricated Modular Cabin House Portable Home for Hotel Apartment
Prefab Detachable 40FT Modular Living Mobile Tiny Homes Prefabricated Portable Container House
3 Bedroom Portable Luxury Villas Customization Prefab House Container House Casa Contenedor Modular Prefabricated House
Prefabricated Factory Price 20/40 FT Tiny Quick Assembly Modern Container House
Folding Prefabricated Container House Portable House Temporary Worker Dormitory Building Prefabricated Modular House
China 40FT Luxury Villa Capsule Steel Frame Building Vessel Living Wooden Modular Casa Prefabricada Container House
Modular Prefabricated Mobile Home 3 Bedrooms Prefab Portable Expandable Container House
Steel Structure Container House Sleeping Prefabricated Home Prefab Camping Tiny House Apple Cabin Modular Prefabricated House
Sourcing guidance for House Product
What are the key technical specifications to consider when sourcing prefabricated houses?
When evaluating house products, you must prioritize structural integrity and material durability. Key specs include Q235 or Q345 galvanized steel frames for corrosion resistance, sandwich panel thickness (50mm-100mm) with Rockwool or PU (Polyurethane) cores for superior thermal insulation and fire resistance, and floor load-bearing capacity (typically ≥200kg/m²). Ensure the windows are double-glazed tempered glass for energy efficiency and soundproofing.
How do I ensure the house product complies with my local building codes?
Compliance is the most critical factor in cross-border housing procurement. You must verify that the supplier can provide CE (Europe), AS/NZS (Australia/New Zealand), or IBC (International Building Code) certifications. Specifically, check for wind load resistance (up to 120km/h or higher) and seismic resistance (Grade 7-9) ratings. Always request stamped structural drawings from the manufacturer to facilitate local permit approvals.
What are the common usage scenarios and customization options for modular houses?
Modular houses are highly versatile, ranging from temporary site offices and labor camps to luxury eco-villas and granny flats. Professional suppliers on Made-in-China.com offer extensive customization, including internal layout modifications, exterior cladding aesthetics (WPC or PVC panels), and integrated smart home systems. For remote areas, ensure the supplier can integrate off-grid solar power and rainwater harvesting systems.
How is the quality of the plumbing and electrical systems validated?
To avoid costly retrofitting, ensure all electrical components (wires, sockets, breakers) meet UL (USA), SAA (Australia), or VDE (Europe) standards. Plumbing should utilize PEX or PPR pipes for longevity. It is highly recommended to request a factory pre-assembly test, where the supplier installs the systems and provides a video walkthrough or third-party inspection report before dismantling for shipment.
Cross-Border Procurement Risks and Strategic Advice
What are the primary risks in international house procurement and how can they be mitigated?
The biggest risks are shipping damage and non-compliance with local zoning. Mitigate these by using Sea Worthy Packaging (steel pallets or reinforced crates) and purchasing Comprehensive Marine Insurance. To ensure transaction security, use Secured Payment services on Made-in-China.com and release funds only after receiving the Bill of Lading and successful third-party quality inspection.
How should I negotiate with suppliers for large-scale housing projects?
Focus on Total Cost of Ownership (TCO) rather than just the unit price. Negotiate for spare parts (extra panels, glass, and fasteners) to be included at no cost (usually 2-3% of order value). For large orders, request a staggered payment schedule linked to production milestones (e.g., 30% deposit, 40% after frame completion, 30% after final inspection) to maintain leverage.
What logistics and shipping methods are best for prefabricated houses?
Most modular houses are shipped via 40ft HC (High Cube) containers. 'Flat-pack' designs allow for 3-4 units per container, significantly reducing freight costs. For fully assembled 'Foldable' houses, ensure the supplier is experienced in SOC (Shipper Owned Container) logistics if the unit dimensions exceed standard shipping sizes. Always confirm the Incoterms (FOB or CIF) to clarify who handles customs clearance and local drayage.
What should be checked during the final pre-shipment inspection?
Conduct a waterproof test (hose test) on the roof and window joints to check for leaks. Verify the galvanization thickness of the steel frame using a coating thickness gauge to ensure rust protection. Finally, ensure a detailed installation manual and video guide are included, as local labor will need these for efficient on-site assembly.





























