Final drive
I have found results from200000+products and80000+suppliers aboutFinal drive
Excavator Final Drive Assy for Dh150 Se210 Ze230e Clg925D GM18 GM35 GM38
R220LC-9s 39q7-40100 R220-9 R225-9 R215-9 R210-9 R260-9 R210LC-7 Final Drive for Hyund*Ai Excavator Parts
Zx200-3 Zx200-5 Zx200-5g Zx210-3 Zx210-5g Hitachi Excavator Final Drive 9233692 9261222 Hmgf40fa
Mag-1700vp-3800, Sk230-6 Final Drive, Travel Motor with Gearbox
Excavator Machinery Parts 21t-27-00400 Final Drive Assembly for PC2000
Final Drive Sprayed with Anti-Corrosion Paint for Marine Applications
Auto Final Drive for Dongfeng Xiaokang 474 11: 43
Ini Hollow Rotary Planetary Gear Cycloid Gear Pinwheel Speed Reducer High Torque Planetary Gearbox Excavator Final Drive
Hot Selling Sk210-8 Travel Motor Sk200-8 Final Drive with Cheap Price
Original New PC300-7 Excavator Parts Travel Motor Final Drive for Sale
Competitor Hydraulic Construction Machinery Parts John Dee-Re D490 Final Drive
Final Drive for XCMG Road Roller Drum Reducer Ift017t2b054 Ift24 Ift20
High Quality Metal End Face Seal Floating Seal Final Drive 195-27-00102
227-6188 / 2276188 Travel Motor Final Drive Assembly for C at 365c Ca T374D Excavator
PC200-8 PC200LC-8 PC210LC-8 Excavator Travel Motor 20y-27-00560 20y2700560 Final Drive
Dx140 Dx225 Dx300 Dx380 Final Drive for Daewoo Doosan Final Drve Assy
Original 561-88-70303 561-88-70304 561-88-70305 Final Drive for Komatsu HD785-7 Dump Truck Parts
PC200-8 Travel Motor 20y-27-00500 PC200-3 Final Drive for Komatsu Excavator
336D 330d 330c 340d 296-6217 2966217 Final Drive
Good Price Mantall 2 Bare Pacing China Wheel Loader Part Final Drive Self-Propelled Xe140W
Excavator Parts 9t-7099 9t-3680 8u-4629 6e-3683 4e-9197 9t-2306 9t-2507 155-9912 Final Drive
Sourcing guidance for Final Drive
What are the key technical specifications to evaluate when sourcing a final drive?
When selecting a final drive, you must prioritize torque density and gear reduction ratios to ensure the unit matches the machine's hydraulic output. Key specs include the displacement (cc/rev), maximum operating pressure (typically 30-35 MPa), and output torque. Ensure the mounting dimensions (flange diameter and bolt hole patterns) are 100% compatible with your specific excavator or crawler model to avoid costly installation failures.
How can I verify the quality and durability of the internal components?
The longevity of a final drive depends on the heat treatment process of the planetary gears and the quality of the floating seals. Request suppliers to provide evidence of induction hardening or carburizing for gears to ensure a surface hardness of HRC 58-62. Additionally, verify that the unit uses high-grade bearings (such as NSK or SKF) and high-pressure resistant oil seals to prevent leakage and premature wear in harsh environments.
What compliance standards and certifications should a professional supplier possess?
Reliable manufacturers should hold ISO 9001:2015 certification for quality management systems. For hydraulic components, look for compliance with CE marking (for the European market) and evidence of rigorous factory testing, including 100% hydraulic leakage tests and noise level testing (typically <80dB) before shipment. Suppliers on Made-in-China.com with 'Audited Supplier' status provide an extra layer of verification regarding their production capabilities.
What are the common usage scenarios and maintenance requirements for final drives?
Final drives are critical for tracked construction machinery like excavators, bulldozers, and drill rigs. To ensure a service life of 5,000+ hours, buyers must emphasize regular gear oil changes (every 500-1,000 hours) and the use of high-viscosity extreme pressure (EP) lubricants. Advise end-users to check for metal shavings in the magnetic plug, which serves as an early warning sign of internal gear fatigue.
Cross-Border Procurement Risks and Strategic Advice
How can I mitigate the risk of receiving a final drive that doesn't fit my machine?
The most common risk is dimensional mismatch. Always provide the supplier with the machine model, part number, and the number of frame/sprocket bolt holes. Request a technical drawing (PDF or CAD) for approval before production. For customized OEM orders, a sample trial is highly recommended to verify hydraulic port alignment and travel speed synchronization.
What are the best practices for negotiating price and lead times with Chinese suppliers?
Focus on Total Cost of Ownership (TCO) rather than just the unit price. Negotiate for extended warranties (12-24 months) instead of small price cuts, as this proves the supplier's confidence in their product. For bulk orders, aim for a 10-15% discount at the 10-unit tier. Ensure the contract specifies a lead time (usually 7-15 days for stock items) with clear penalties for delays to protect your supply chain.
How should final drives be packaged and shipped to ensure safe arrival?
Final drives are heavy, high-precision hydraulic components. They must be shipped in fumigated wooden crates with internal shock-absorbing foam and anti-rust VCI bags. Since these units contain residual oil, ensure the supplier provides a Non-Hazardous Chemical Declaration to avoid customs delays. For international shipping, FOB or CIF terms are standard; however, ensure the cargo is insured for its full replacement value.
How can I ensure transaction security when dealing with overseas suppliers?
Utilize secure payment methods and prioritize suppliers on Made-in-China.com who offer Star Ratings and comprehensive audit reports. Always conduct a pre-shipment inspection (PSI)—either via a third-party agency or by requesting a video of the unit undergoing a pressure test with your specific serial number visible—to ensure the product meets the agreed-upon performance benchmarks before final payment.





























