SourcingAI

Zl50gn wheel loader

I have found results from6000+products and1000+suppliers aboutZl50gn wheel loader

Commonly Used:
US$
—
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Type: Medium-sized Loader
Type: Universal Type
Type: Wheel Loader
Type: Small Loader
Type: Large Loader
Certification: ISO
Condition: New
Rated Load: 3-6t
Transmission: Hydraulic
Load and Unload Mode: Front Discharge
Walking Mode: Wheeled
Load and Unload Method: Front Discharge
Engine Power: 147~515kw
Color: Yellow
Bucket Width: 108 inches
Load Capacity: 5 tons
Operating Hours: 1001-1500 hours
Certification: CE
Certification: ISO9001: 2000
Certification: TUV
Certification: RoHS
Condition: Used
Transmission: Hydraulic Transmission
Hydraulic - Mechanical
Transmission: Power
Engine Power: 125 hp
Engine Power: 200 hp
Operating Hours: 500-1000 hours

Sourcing guidance for Zl50gn Wheel Loader

What are the key technical specifications to verify for a ZL50GN wheel loader?

The ZL50GN is a heavy-duty 5-ton loader. You must verify the rated load capacity (5000kg), engine power (typically 162kW), and maximum breakout force (≥170kN). Ensure the engine meets your local emission standards, such as Tier 2/3 or Stage III/IV, and confirm the use of heavy-duty structural parts and planetary transmission for high-torque applications.

How do I ensure the loader meets international safety and quality standards?

Prioritize suppliers who provide CE certification for the European market or EAC for the Eurasian region. The machine should comply with ISO 9249 for engine net power and ISO 3471/3449 for ROPS/FOPS (Roll-Over/Falling Object Protective Structures) to ensure operator safety in mining or construction environments.

What usage scenarios is the ZL50GN best suited for?

This model is a 'workhorse' designed for heavy-load conditions. It is ideal for earthmoving in large construction sites, material handling in ports, open-pit mining, and logistics in gravel yards. For specialized tasks, ask the supplier for attachments like log grapples, grass forks, or side-dump buckets.

What are the maintenance requirements for long-term operational efficiency?

To maximize ROI, ensure the supplier provides a detailed maintenance schedule. Key focus areas include hydraulic oil filtration, greasing of hinge pins every 10-50 hours, and transmission pressure checks. Look for units featuring centralized lubrication systems and pressure measurement points to reduce downtime.

Cross-Border Procurement & Risk Management for Heavy Machinery

How should I handle the shipping and logistics for a ZL50GN loader?

Due to its size, the ZL50GN is typically shipped via RORO (Roll-on/Roll-off) or Bulk Cargo vessels. If using containers, the machine must be partially disassembled (wheels and cab removed) and packed into 40HC containers. Ensure the supplier uses anti-corrosion wax coating to protect the metal surfaces from sea salt during transit.

What are the common risks when purchasing heavy equipment from overseas?

The primary risks include specification mismatch and lack of local after-sales support. Mitigate this by requesting a pre-shipment inspection (PSI) through third parties like SGS or Intertek. Always confirm the availability of wear parts (teeth, filters, seals) in your local market or negotiate a spare parts package to be included in the initial shipment.

How can I verify the authenticity of a supplier on Made-in-China.com?

Look for Audited Suppliers who have undergone on-site verification by independent inspection companies. Check their Business License, Export License, and Production Capacity Reports. It is highly recommended to use Secured Trading services to ensure your payment is only released after the bill of lading is confirmed.

What negotiation strategies work best for bulk machinery orders?

Focus on the Total Cost of Ownership (TCO) rather than just the unit price. Negotiate for extended powertrain warranties (e.g., 24 months/4000 hours), free technician training videos, or a discounted container of consumables. For orders exceeding 3 units, aim for a 5-8% volume discount or upgraded air-conditioned cabs at no extra cost.

Related queries