SourcingAI

Used gas turbine

I have found results from100000+products and50000+suppliers aboutUsed gas turbine

Commonly Used:
US$
—
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Type: Aircraft
Mechanical Turbocharger System
Condition: Used
Certification: ISO
Application: Industrial
Specification: Normal
Voltage: 10kV
Thermal Power Generation
Phase: Three Phase
Vacuum Aspirated Casting
Process: Investment Casting
Molding Technics: Gravity Casting
Material: Alloy Steel
Surface Preparation: Sand Blast
Surface Roughness: Ra0.4
Machining Tolerance: +/-0.01mm
Standard: ASME
Power: 50-200kW
Generator Type: Synchronous Generator
AC Three Phase
Gas Source: Natural Gas
Flying Range: Internal
Task: Program
Structure: Combination
Mathematical Model: Linear
Signal: Continuous
Function: Automatic Control
Customized: Customized
Body Material: Alloy
ETS Component: Turbine
ETS Type: Axialflow
Application Fields: Chemical
Noise Level: Low
Air Purification Components
Purpose: Gas Separation
Air separation equipment
Working principle: Condensation separation
Electric Turbocharger Type: Axialflow
Manufacturing Process: CNC Milling
Surface Treatment: Spray-Paint
Operation Pressure: Atmospheric Pressure
Condition: New
Certification: CB
Certification: CE
Certification: RoHS
Certification: ISO 9001:2000
Certification: ISO 9001:2008
Certification: CCC
Certification: ISO9001
Certification: TLC
Certification: UR
Application: Commercial
Application: Machinery Parts
Metal Processing Machinery Parts
Material: Alloy
Standard: Nonstandard
Standard: Standard
Standard: DIN
Standard: ASTM
Standard: GOST
Standard: GB
Standard: JIS
Standard: ANSI
Standard: BS
Generator Type: Alternator
Output Type: DC
Gas Source: Gas
Structure: Horizontal
Function: Protection
Function: Monitoring
Function: Measurement
Customized: Non-Customized
Application Fields: Electronic
Application Fields: Petroleum

Sourcing guidance for Used Gas Turbine

What are the critical technical specifications to evaluate when purchasing a used gas turbine?

Buyers must prioritize the Total Running Hours (TRH) and Starts/Stops count, as these directly impact the remaining life of the hot gas path components. It is essential to verify the ISO Base Rating (MW), Heat Rate (kJ/kWh), and Exhaust Temperature. Ensure the turbine is compatible with your local Grid Frequency (50Hz or 60Hz) and check if the Fuel System supports your available supply (e.g., Natural Gas, Diesel, or Dual-fuel).

How can a buyer verify the mechanical integrity and maintenance history of a used turbine?

Request a comprehensive Borescope Inspection (BI) report and the Original Equipment Manufacturer (OEM) service logs. Look for evidence of Major Overhauls (MO) and Hot Gas Path Inspections (HGPI). A high-quality used unit should come with a Zero-hour overhaul certification if it is marketed as 'refurbished.' Always confirm if the Control System (e.g., Mark VIe, Woodward) is up-to-date or requires an expensive retrofit.

What compliance and environmental standards are necessary for international resale?

The equipment must meet local NOx and CO emission limits, which may require the presence of Dry Low NOx (DLN) burners or Selective Catalytic Reduction (SCR) systems. Ensure the unit complies with ASME or CE pressure vessel standards for the heat recovery steam generator (HRSG) if applicable. For cross-border trade, a Pre-Shipment Inspection (PSI) certificate is often mandatory to prove the machinery is not 'electronic waste' but functional industrial equipment.

What is the economic feasibility of buying used versus new gas turbines?

Used gas turbines typically offer a 40-60% reduction in CAPEX and significantly shorter lead times (weeks vs. 12-18 months for new units). However, buyers must factor in the Total Cost of Ownership (TCO), including dismantling, refurbishment, shipping, and site integration. A unit with a lower purchase price but high Heat Rate (lower efficiency) may result in higher long-term operational costs due to fuel consumption.

Cross-Border Procurement Risks and Strategic Advice for Used Heavy Machinery

What are the primary risks in cross-border transactions for used turbines?

The biggest risks include hidden mechanical defects and missing documentation. To mitigate this, use Escrow payment services or Letters of Credit (L/C) that release funds only upon successful third-party inspection at the loading port. Avoid full advance payments. We highly recommend sourcing through verified 'Diamond Members' or 'Audited Suppliers' on Made-in-China.com to ensure supplier legitimacy.

How should buyers negotiate with suppliers regarding spare parts and warranties?

Negotiate for a 'Critical Spare Parts Package' (e.g., fuel nozzles, filters, and sensors) to be included in the sale price. Since used equipment is often sold 'as-is,' try to secure a limited operational warranty (e.g., 6 months or 2,000 operating hours) contingent upon the supplier's team supervising the Installation and Commissioning (I&C).

What logistics and shipping precautions are unique to gas turbines?

Gas turbines are Out-of-Gauge (OOG) cargo and require specialized Heavy Lift vessels. Ensure the supplier provides a detailed Packing List and Moisture Protection (Vacuum sealing/Shrink wrapping) for the rotor and electronics to prevent corrosion during sea transit. Verify the Incoterms clearly; FOB or CIF are standard, but ensure the seller provides the Export License for dual-use industrial goods.

How to ensure transaction security and alignment with international trade policies?

Check for Sanctioned Party Screenings to ensure the equipment origin and the seller are not under international trade restrictions. Utilize third-party inspection agencies like SGS or Intertek to witness the 'Full Load Test' or 'Turning Gear Test' before final payment. Always align the contract with ICC Incoterms 2020 to clearly define the point of risk transfer.

Related queries