Used gas turbine
I have found results from100000+products and50000+suppliers aboutUsed gas turbine
40MW Used Gas Turbine for Data Center Fast Track
30MW Gas Turbine for Ai Data Center, Steel, Refinery
713&718 Superalloy Investment Casting Gas Turbine Turbine Rotor
Waste Heat Recovery Steam Turbine for Industrial Exhaust Gas
Inconel 713/718/738 Turbine Vane NGV Gas Engines Turbine Components
Steam and Gas Turbine Impeller Nozzle Guide Vane NGV High Quality and Precision
Horbon Hb600 Distributed Control System Steam Turbine/Gas Turbine/Power Plant
Nickel-Based Super Alloy Turbine Disk for Gas Turbine
OEM Customized Superalloy Turbine Disk for Gas Turbine
High-Efficiency Used Solar Titan 130 Pg Gas Turbine Generator
Industrial Used Solar Titan 130 Pg Gas Turbine with Steam Cogeneration
Titan 130 Pg Used Gas Turbine Generator Combined with Steam
Expansion Turbine Turboexpander Compressor Cryogenic Air Separation Gas Turbine Expander Booster Turbine
Second-Hand Gas Turbine Units of Certain Models From Siemens/Ge/Solar
One Year or 1500 Running Hours 200kw 300kw 400kw 500kw Gas Turbine 20kw-2MW
Low Pressure Steam Turbine Professional Manufacturer with High Efficiency Gas Generator
High Pressure Turbine Rotating Blade Single Component for Mini Turbojet Gas Generator
Used Gas Turbine with All Supporting Equipment, Used Steam Turbine Generator for Sale
Natural Gas Engine Powered Water Cooled Genset Biogas Biomass Gas Turbine
100kw 1000kw Steam Turbine with Biomass Steam Boiler Gas Generator for Electricity Generation
High-Precision CNC Machined Gas Turbine Wheel Components for Generators
Used Gas Turbine Second Hand Gas Turbine for Power Generation
High-Strength Medium-Displacement Steel Guide Turbine for Oil and Gas Well Drilling
High-Strength Triple-Blade Turbine for Oil and Gas Well Drilling
Sourcing guidance for Used Gas Turbine
What are the critical technical specifications to evaluate when purchasing a used gas turbine?
Buyers must prioritize the Total Running Hours (TRH) and Starts/Stops count, as these directly impact the remaining life of the hot gas path components. It is essential to verify the ISO Base Rating (MW), Heat Rate (kJ/kWh), and Exhaust Temperature. Ensure the turbine is compatible with your local Grid Frequency (50Hz or 60Hz) and check if the Fuel System supports your available supply (e.g., Natural Gas, Diesel, or Dual-fuel).
How can a buyer verify the mechanical integrity and maintenance history of a used turbine?
Request a comprehensive Borescope Inspection (BI) report and the Original Equipment Manufacturer (OEM) service logs. Look for evidence of Major Overhauls (MO) and Hot Gas Path Inspections (HGPI). A high-quality used unit should come with a Zero-hour overhaul certification if it is marketed as 'refurbished.' Always confirm if the Control System (e.g., Mark VIe, Woodward) is up-to-date or requires an expensive retrofit.
What compliance and environmental standards are necessary for international resale?
The equipment must meet local NOx and CO emission limits, which may require the presence of Dry Low NOx (DLN) burners or Selective Catalytic Reduction (SCR) systems. Ensure the unit complies with ASME or CE pressure vessel standards for the heat recovery steam generator (HRSG) if applicable. For cross-border trade, a Pre-Shipment Inspection (PSI) certificate is often mandatory to prove the machinery is not 'electronic waste' but functional industrial equipment.
What is the economic feasibility of buying used versus new gas turbines?
Used gas turbines typically offer a 40-60% reduction in CAPEX and significantly shorter lead times (weeks vs. 12-18 months for new units). However, buyers must factor in the Total Cost of Ownership (TCO), including dismantling, refurbishment, shipping, and site integration. A unit with a lower purchase price but high Heat Rate (lower efficiency) may result in higher long-term operational costs due to fuel consumption.
Cross-Border Procurement Risks and Strategic Advice for Used Heavy Machinery
What are the primary risks in cross-border transactions for used turbines?
The biggest risks include hidden mechanical defects and missing documentation. To mitigate this, use Escrow payment services or Letters of Credit (L/C) that release funds only upon successful third-party inspection at the loading port. Avoid full advance payments. We highly recommend sourcing through verified 'Diamond Members' or 'Audited Suppliers' on Made-in-China.com to ensure supplier legitimacy.
How should buyers negotiate with suppliers regarding spare parts and warranties?
Negotiate for a 'Critical Spare Parts Package' (e.g., fuel nozzles, filters, and sensors) to be included in the sale price. Since used equipment is often sold 'as-is,' try to secure a limited operational warranty (e.g., 6 months or 2,000 operating hours) contingent upon the supplier's team supervising the Installation and Commissioning (I&C).
What logistics and shipping precautions are unique to gas turbines?
Gas turbines are Out-of-Gauge (OOG) cargo and require specialized Heavy Lift vessels. Ensure the supplier provides a detailed Packing List and Moisture Protection (Vacuum sealing/Shrink wrapping) for the rotor and electronics to prevent corrosion during sea transit. Verify the Incoterms clearly; FOB or CIF are standard, but ensure the seller provides the Export License for dual-use industrial goods.
How to ensure transaction security and alignment with international trade policies?
Check for Sanctioned Party Screenings to ensure the equipment origin and the seller are not under international trade restrictions. Utilize third-party inspection agencies like SGS or Intertek to witness the 'Full Load Test' or 'Turning Gear Test' before final payment. Always align the contract with ICC Incoterms 2020 to clearly define the point of risk transfer.