Collapsible house
I have found results from20000+products and6000+suppliers aboutCollapsible house
Prefabricated Easy and Quick Intalled Collapsible Container House
Prefabricated Collapsible Fast Installation Bathroom Fully Fitted Portable Expandable House
Collapsible House Folding Container House with Quick Setup for Storage
Bim-Refined, Collapsible Design Portable House with Kitchen and Bathroom
Steel Structural Materials Container Houses Made in China Prefabricated Modern Houses Collapsible Houses
2 Bedroom Foldable Prefabricated Houses Portable Collapsible Expandable Container House
Low Cost Workers Living Collapsible Modular K Home Steel Structure Prefabricated House for Labor Camp
Foldable Collapsible House Comfortable & Livable Ortable House Ready Stock Casa Prefabricada De Contenedor
Fireproof Collapsible Capsule House Modern Tiny Prefab Home for Backyard and Resort Living
20 FT Container House Mini Modular House Portable Collapsible House Prefabricated Compact Expandable Container House
Detachable Collapsible Expandable Quick-Assembly Container House for Gas Field Housing
Modern Light Steel Luxury Collapsible Expansion Flat Pack 20 Feet 40 Feet Villa Prefabricated Container House
Customizable Collapsible Pavilion Container House for All Events
Cheapest Price Mobile Room Foldable 20FT Folding Container House Portable Collapsible Modular Folding Home for Sale
20FT Modular Office Foldable Prefabricated Expandable Flat Roof Container Collapsible House
Collapsible Modular Tiny Home Dormitory Labour Camp 3m*6m Detachable Container House
Large Prefabricated Collapsible 20FT 40FT Expandable Container House Prefab Building Home 2 4 5 Bedroom Casa Contenedor
Storage Temporary Living Dormitory Prefab Prefabricated Shelter Collapsible Folding Office Container House
Steel Structure Modular Prefabricated Collapsible and Expandable Container House
Sourcing guidance for Collapsible House
How to choose a high-quality Collapsible House for B2B procurement?
Selecting a collapsible house (expandable container house) requires focusing on structural integrity and material durability. Prioritize units with a galvanized steel frame to prevent rust and fireproof sandwich panels (EPS, Rock Wool, or PU) for insulation. Ensure the folding hinges are made of reinforced stainless steel to withstand multiple deployments without structural fatigue.
What are the key technical specifications and compliance standards for international markets?
Buyers must verify that the structure meets ISO 9001 for manufacturing quality and CE or UL certification for electrical systems. Key specs include wind resistance (typically Grade 10-11), floor load capacity (≥200kg/m²), and roof snow load ratings. For the US or EU markets, ensure the materials meet ASTM or EN fire safety standards.
How can I evaluate the insulation and waterproofing performance?
Request the R-value of the wall panels; higher values indicate better thermal efficiency. For waterproofing, check if the roof design includes a built-in gutter system and if the joints use marine-grade sealant and EPDM rubber strips. A high-quality collapsible house should remain leak-proof even under heavy rain conditions (≥100mm/h).
What customization options should a professional supplier provide?
Top-tier suppliers on Made-in-China.com should offer modular interior layouts, including pre-installed kitchenettes, sanitary wares, and electrical circuits tailored to the destination country's voltage (e.g., 110V vs 220V). Customization of external cladding (PVC or wood-plastic) is also vital for aesthetic integration in residential projects.
Cross-Border Purchasing Considerations for Collapsible Houses
What are the primary logistics and shipping risks for collapsible houses?
The biggest risk is sea salt corrosion and physical impact during transit. Ensure the supplier uses protective film and corner bracing. Since these are shipped as 'flat-packs,' verify that a 40HC container can fit the maximum number of units (usually 2-6 units depending on size) to optimize freight costs.
How can I ensure transaction security and supplier reliability?
Utilize Secured Trading Services on Made-in-China.com to protect your payment until delivery. Always conduct a third-party factory audit or request a live video inspection to verify the supplier's production capacity and raw material inventory before sending a large deposit.
What should be included in the negotiation with the supplier?
Negotiate for spare parts kits (extra hinges, sealant, and touch-up paint) and a comprehensive installation manual or video guide. For bulk orders, aim for a 10-15% discount and request a warranty period of at least 2-5 years on the main steel structure.
How do I handle customs clearance and local building codes?
Before shipping, consult a local customs broker regarding HS Code 940690 (Prefabricated Buildings) to determine import duties. Ensure the supplier provides a detailed packing list and Certificate of Origin to benefit from potential Free Trade Agreement (FTA) tariff exemptions.





























